Plans and Elevations from the Architect dated 2.20.09... Marked-Up on 4.6.09.
10/1/09:
..Posted a Color Rendition displaying the Hood Assembly for the KITCHEN.
9/15/09:
..Posted a Color Rendition displaying the Hood Assembly for the KITCHEN.
..Posted a Configuration File describing construction of the Hood Assembly in the KITCHEN.
6/16/09:
..Posted the Plans and Elevations for Sign-off, ..(4) Page Color Portfolio of Renditions displaying Cabinetry, and a new Configuration File for Review for the KITCHEN. There were so many Changes that this File was completely redrawn.
6/12/09:
..Posted the Plans and Elevations for Sign-off, Color Rendition displaying Cabinetry, and the modified CNFG File for Review for the BATH-Dwn.
6/11/09:
..Posted the Plans and Elevations for Sign-off, (2) Page Portfolio of Color Renditions displaying Cabinetry, and the modified CNFG File for Review for the LAUNDRY.
6/7/09:
..Posted the Plans and Elevations for Sign-off, Color Rendition displaying Cabinetry, and the modified CNFG File for Review for the BATH-Pwdr.
6/7/09:
..Posted the Plans and Elevations for Sign-off, Color Rendition displaying Cabinetry, and the modified CNFG File for Review for BATH-205.
6/7/09:
..Posted the Plans and Elevations for Sign-off, Color Rendition displaying Cabinetry, and the modified CNFG File for Review for BATH-204.
6/6/09:
..Posted the Plans and Elevations for Sign-off, Color Rendition displaying Cabinetry, and the modified CNFG File for Review for the BATH-Master.
4/30/09:
..Posted the Configuration File for Review in the Kitchen. The Dishwasher and Door Jamb Placement are the two big Issues.
4/30/09:
..Critical Placement of the Door Jambs to honor Architects Layout of Cabinetry in the KITCHEN.
4/28/09:
..Posted the CNFG File for Review in the LAUNDRY.
4/21/09:
..Posted the CNFG File for Review in the BATH-Pwdr.
4/20/09:
..Posted the CNFG File for Review in the BATH-Dwn.
4/18/09:
..Posted the CNFG File for Review in the BATH-Mstr.
4/7/09:
..Posted the CNFG File for Review in BATH-204.
..Posted the CNFG File for Review in BATH-205.
Rooms:
|
Number
|
Room Name | Construction |
|
100's
|
KITCHEN | Paint Grade / FaceFrame 1/2" Overlay / Solid Aprons / Toe 4-1/2"H x 2.5"D / Panelized End |
|
200's
|
LAUNDRY | Paint Grade / FaceFrame 1/2" Overlay / Solid Aprons / Toe 4"H x 2"D |
|
300's
|
BATH-Mstr | Paint Grade / FaceFrame 1/2" Overlay / Solid Aprons / Toe 4"H x 2.5"D |
|
400's
|
BATH-Pwdr | Paint Grade / FaceFrame 1/2" Overlay / Solid Aprons / Toe 6"H x 2.5"D / Panelized End / Furniture Kick w-Cutout |
|
500's
|
BATH-Dwn | Paint Grade / FaceFrame 1/2" Overlay / Solid Aprons / Toe 4"H x 2.5"D / Finished End beside Tub |
|
600's |
BATH-204 | Paint Grade / FaceFrame 1/2" Overlay / Solid Aprons / Toe 4"H x 2.5"D / Panelized End |
|
700's
|
BATH-205 | Paint Grade / FaceFrame 1/2" Overlay / Solid Aprons / Toe 4"H x 2.5"D / Panelized End |
Spec Sheets:
|
Room(s)
|
Spec Sheet |
|
KITCHEN
|
8/6/09 |
|
LAUNDRY-BATHs (all)
|
8/6/09 |