Plans and Elevations Page:


BAR:

 
09.01.2011:
..Plans and Elevation along with Perspective for Sign-off.
 
08.27.2011:
..Plans and Elevation along with Perspective for Sign-off.
 
 

KITCHEN:

 
07.28.2011:
..Modified Elevation and Perspective for Sign-off for the Kitchen Hood Assembly.
 
07.24.2011:
..Elevation and Perspective for Sign-off for the Kitchen Hood Assembly.
 
06.22.2011:
..re-re-re-re-Revised Plans and Elevations for Sign-off. Door and DWR Front Changes. Resize MW Cabinet..
 
06.15.2011:
..re-re-re-Revised Plans and Elevations for Sign-off. Incorporate MW Sizing and add Plant-ons.
 
06.13.2011:
..re-re-Revised Plans and Elevations for Sign-off.
 
06.07.2011:
..re-Revised Plans and Elevations for Sign-off.
 
06.02.2011:
..Revised Plans and Elevations for Sign-off.
 
05.31.2011:
..Revised Cross-Sectional View of Cabinetry Construction.
 
05.15.2011:
..Plans and Elevations for Sign-off.
 
05.03.2011:
..a Cross-Sectional View of Cabinetry Construction.
..a Preliminary Plan-View Layout including a Peninsula.
 
 