Kare-Const--Jensen
- Main Page:
Table of Contents on the Bottom of the Page.
10.20.2010:
..Posted the re-re-MODIFIED (5) Page Plans and Elevations for Sign-off.
10.19.2010:
..Posted the re-MODIFIED (5) Page Configuration CADD File for Review. Switched to Face-Frame Construction utilizing 1/2" Overlay Hinging.
10.16.2010:
..Posted the re-MODIFIED (5) Page Plans and Elevations for Sign-off. Plans modified to show a Side-View of the Basket-Upper and to display the Crown Moulding about the entire Room.
10.15.2010:
..Posted the MODIFIED (5) Page Plans and Elevations for Sign-off.
..Posted another (3) Page Portfolio of Color Renditions displaying Cabinetry.
..Posted the re-MODIFIED (5) Page Configuration CADD File for Review.
10.14.2010:
..Posted the MODIFIED (5) Page Configuration CADD File for Review. The Upper Door widths on the West Wall will control the New Window Placement.
10.11.2010:
..Posted the (5) Page Plans and Elevations for Sign-off.
..Posted a (2) Page Portfolio of Color Renditions displaying Cabinetry.
..Posted the (5) Page Configuration CADD File for Review.
10.09.2010:
..Posted the Appliance information for the Range and Fridge.
| Table of Contents: |
| ..the Plans and Elevations Page. |
| ..the Renditions Page. |
|
..the Communications Page. |
| ..the Appliances Page. |